TitleProduct

High Efficiency Slag-removing Agent

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2021-11-20 07:50

  • Browse the number:

    372

Send an inquiries

Company Profile

Dingri Group

By certification [File Integrity]

Contact:dingrigroup(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.dingrigroup.com/ http://dingrigroup.hongsenwire.com/

Product Details


Slag-removing Agent DR46 

Slag-removing Agent DR46 is a new invention products that provides a slag-forming agent for iron and steel metallurgy. Slag-removing Agent has strong slagging ability, and its usage is only 50%-70% of fluorite, which can greatly reduce the production cost. Slag-removing Agent can better lower the melting point of lime, quickly form slag, have better desulfurization effect, and can extend the life of refractory materials.


● Advantages and Savings

Efficiency: Application of DR46 is exactly the same as you currently use fluorspar but with low carbon that will more efficient on steelmaking process. You simply consume less material.

Supply stability: Having several sites all over the world Dingri Group guarantees a flexible supply with a cost-effective solution.

Price advantage: DR46 has a stable price advantage compared to fluorspar.

Increased refractory life with a faster desulfurization: With much lower silica content and decreasing the time needed for desulfurization, DR46 increases your refractory life.

Better slag, faster desulfurization and cleaner steel: The fluidity of the slag is increased through a faster and a more performance processes at lower temperatures.


FAQ:

  1. Q:Are you factory?
    A:Yes,our factory have a history for more than 25 years.

  2. Payment term :
    A:T/T, L/C,Western Union, PayPal ALIBABA,Money Gram, ; all could be acceptable with discussion.

  3.  Price period:
       1)FOB,CIF,DDU/DDP: one week
       2)EXW : 1-3 months

  4. Q:What's the delivery time?
    A:Within 15 days after received the advanced payment.

  5. packing:1000Kg/bag, other forms of packaging can also be used according to customer requirements.


6. Q: Is the dosage of slag agent and fluorite the same?

A: Slagging agent is 70% of the amount of fluorite.

 

7. Q: What is the effect of slagging agent compared with fluorite?

A: The new slag reducer has the advantages of faster desulfurization rate and lower melting point than firefly slag.

 

8. Q: In which part of the steelmaking process is the new slagging agent used?

A: The slagging agent is added to the molten steel at the same time as lime in the converter.

 



http://www.dingrigroup.com/